The CMM Group | Industries Served | Equipment Solutions
2071-C Lawrence Drive, P.O. Box 5903
De Pere, WI 54115-5903
Phone: 920-336-9800 • Fax: 920-336-9797
Website: www.thecmmgroup.com



CONTACT US


Contact The CMM Group For Additional Information Or Request For Quotes.
We Look Forward To Working With You.

The CMM Group, LLC
2071–C Lawrence Drive,
P.O. Box 5903
De Pere, WI 54115-5903
Phone: (920) 336-9800
Fax: (920) 336-9797
Toll Free: 866-336-9800
Email: info@thecmmgroup.com


If you have a question or comment or would like additional information,
please let us know.

General Information required for APCS Project Development

  • A brief description of the process emitting air pollutant.
  • Hours of operation.
  • Exhaust rates and temperature of process to be controlled.
  • Types of air pollutants to be destroyed and in what quantity.
  • Identify known compounds such as silicone, phosphorus, heavy metals, halogen, particulate and/or sulfur that may be present.
  • Types of auxiliary fuel available (natural gas, propane, fuel oil, etc.).
  • Electrical power requirements (voltage, hertz, phase).
  • Installation supervision or complete turnkey installation requirements.
  • Physical installation area and/or site space limitations.
  • Production uses for energy that could be recovered (i.e., hot air, hot water, steam, hot oil).

General Information required for Oven/Dryer Project Development

  • A description of the product to be cured, baked or dried.
  • Maximum/minimum product width and expected line speed.
  • Maximum/minimum operating and/or product temperatures.
  • Anticipated length of oven/dryer and number of temperature zones.
  • Special requirements such as food grade, clean room conditions, etc.
  • A description of the substance to be evaporated (solvent, water, etc.).
  • Materials of construction (stainless steel, carbon steel, etc.).
  • Specify a desired heat source (natural gas, propane, fuel oil, electric, etc.)
  • Electrical power requirements (voltage, hertz, phase).
  • Installation supervision or complete turnkey installation requirements.
  • Physical installation area and/or site limitations.
  • Production uses for energy that could be recovered (i.e., hot air, steam, hot oil, hot water).

Consulting - Site Engineering - R&D/Product Engineering - Custom Design/Build - Turnkey Installations
Start-Up & Training Services - Emergency Parts & Service - PM Inspections & Service Contracts

Phone: (920) 336-9800
The CMM Group, LLC, 2071-C Lawrence Drive, P.O. Box 5903, De Pere, WI 54115-5903
Email: info@thecmmgroup.com * Web Site:www.thecmmgroup.com * Copyright 2009 © The CMM Group, LLC